Residential

Suburban Home Installation

Kitchener, ON
10 kW System
Completed March 2023

Family home solar installation with electric vehicle charging integration.

Share this project:
Suburban Home Installation
1 / 3
10 kW
System Size
25
Solar Panels
12,000 kWh
Annual Production
25 years
Warranty

The Challenge

Growing family with two EVs needed solar system to support increased electricity demand.

Our Solution

10 kW system sized for home consumption plus dual EV charging throughout the day.

Results Achieved

  • 85% electricity bill reduction
  • Both EVs charged with solar
  • Environmental impact: 8 tons CO2/year
  • 8-year payback timeline

Installation Timeline

From consultation to activation

1-2 weeks

Consultation & Design

Initial site assessment, energy analysis, and custom system design

1
2-4 weeks

Permits & Approvals

Securing all necessary permits and utility approvals

2
1-3 days

Installation

Professional installation of panels, inverters, and electrical systems

3
1-2 weeks

Inspection & Commissioning

Final inspections, testing, and system activation

4
4-8 Weeks
Typical Total Project Duration

Environmental Impact

Making a difference for our planet

1.6 tons
CO₂ Offset Annually

Reducing greenhouse gas emissions equivalent to removing cars from the road

78
Trees Planted

Carbon absorption equivalent to planting and growing mature trees

0.3
Cars Off the Road

Equivalent to removing gasoline-powered vehicles from the road for a year

Additional Benefits

100%
Clean Energy
0
Air Pollution
0
Water Usage
25+
Years Production
Produces
12,000 kWh/year
Offsets
1.6 tons CO₂

Ready for Your Own Solar Installation?

Let us design a custom solar solution for your property. Get a free quote and join hundreds of satisfied customers across Canada.